Technical Report 4 (translated)
Picture 2.13Primary and secondary networks of potable waterin the districts involved in the project in (km)Source: Statistical Yearbook 2004 – Management of development and Investigation – SEDAPALNonPrimary1 Bellavista 9.8 83,52 Scrub 3.3 119,83 Callao 72.4 528,74 Carabayllo 5.4 268,05 Carmen of Legua 0.0 34,06 Commas 14.1 489,37 Agustino 22.3 152,58 Independence 5.4 211,39 Jesus Maria 7.2 55,910 Per It 0.9 59,311 End 0.0 17,012 Victory 16.8 211,113 It files 28.0 420,014 Lynx 8.2 46,815 Olive trees 25.8 400,816 Magdalena of Sea 3.1 65,917 Miraflores 16.0 174,218 Town Frees 4.7 96,919 Rímac 6.0 147,020 S. Juan de Lurigancho 46.8 914,421 San Isidro 14.5 188,322 San Martín de Porras 8.6 618,823 San Miguel 6.0 186,524 Santa Anita 0.1 189,7325,4 5.680Secondary DistrictsTotal population of the ProjectPROFILE: CONSTRUCTION OF THE PLANT OF RESIDUAL WATER TREATMENTTABOADA And SUBMARINE EMISSARY - DISTRICT And PROVINCE Of the CALLAO42Domiciliary connectionsIn the area of influence of the project a total of 703.391 water connections existspotable, that includes 491.993 connections with measurement and 211.399 connections withoutmeasurement.Considering that the area of the project is conformed by 8 areas of drainage which they will beanalyzed separately for the calculation of the demand of potable water and treatment ofresidual waters, have been seen by advisable determining the number of connections ofpotable water by existing type of user in each area of drainage.In Picture 2.15 is the total number of connections by each area of drainage,with measurement and without measurement. The connections by type of user in each area of drainageone is in the subsequent pictures.Picture 2.14Total of connections in the drainage areasSource: Equipment Commercial Management - SEDAPALPicture 2.15Connections by type of User – Costanero AreaSource: Equipment Commercial Management, December 2005 - SEDAPALCONNECTION BY TYPE DE No. of TOTALTYPE OF USUARY Conex MEASUREMENT. Conex.With Measurer 33,732Without Measurer 3.806 37,538With Measurer 5,217Without Measurer 693 5,909With Measurer 344Without Measurer 105 449With Measurer 505Without Measurer 80 585With Measurer 105Without Measurer 31 135SocialTOTAL 44,618DomesticCommercialIndustrialistStateTOTAL TOTAL-CM TOTAL-SMCostanero 39,903 4,715 44.618Navy 71,286 13,485 84.771Argentina 27,959 7,977 35.935Not 19 65,986 45,122 111.108Centenerio 33,819 15,616 49.436Not 6 131,668 42,390 174.058Bocanegra 7,112 4,511 11.623Commas - Chillón 114,261 77,582 191.842491.993 211,399 703.391Note:Total TOTAL-CM = with measurementTotal TOTAL-SM = without measurementArea of DrainageTotal Area of DrainageTOTAL CONNECTIONSPROFILE: CONSTRUCTION OF THE PLANT OF RESIDUAL WATER TREATMENTTABOADA And SUBMARINE EMISSARY - DISTRICT And PROVINCE Of the CALLAO43Picture 2.16Connections by type of User – Area NavySource: Equipment Commercial Management, December 2005 - SEDAPALPicture 2.17Connections by type of User – Argentina AreaSource: Equipment Commercial Management, December 2005 - SEDAPALPicture 2.18Connections by type of User – Area Collector Not 19Source: Equipment Commercial Management, December 2005 - SEDAPALCONNECTION BY TYPE DE No. of TOTALTYPE OF USUARY Conex MEASUREMENT. Conex.With Measurer 61,070Without Measurer 11.230 72,300With Measurer 8,392Without Measurer 1.881 10,273With Measurer 948Without Measurer 215 1,163With Measurer 708Without Measurer 81 789With Measurer 168Without Measurer 78 246DomesticCommercialIndustrialistStateSocialTOTAL 84,771CONNECTION BY TYPE DE No. of TOTALTYPE OF USUARY Conex MEASUREMENT. Conex.With Measurer 24,199Without Measurer 7.197 31,396With Measurer 2,851Without Measurer 513 3,364With Measurer 417Without Measurer 72 488With Measurer 414Without Measurer 67 480With Measurer 78Without Measurer 129 206DomesticCommercialIndustrialistStateSocialTOTAL 35,935CONNECTION BY TYPE DE No. of TOTALTYPE OF USUARY Conex MEASUREMENT. Conex.With Measurer 60,300Without Measurer 42.691 102,991With Measurer 3,647Without Measurer 1.480 5,127With Measurer 979Without Measurer 387 1,366With Measurer 793Without Measurer 193 986With Measurer 266Without Measurer 371 638SocialTOTAL 111,108DomesticCommercialIndustrialistStatePROFILE: CONSTRUCTION OF THE PLANT OF RESIDUAL WATER TREATMENTTABOADA And SUBMARINE EMISSARY - DISTRICT And PROVINCE Of the CALLAO44Picture 2.19Connections by type of User – Centennial AreaSource: Equipment Commercial Management, December 2005 - SEDAPALPicture 2.20Connections by type of User – Area Collector Not 6Source: Equipment Commercial Management, December 2005 - SEDAPALPicture 2.21Connections by type of User – Bocanegra AreaSource: Equipment Commercial Management, December 2005 - SEDAPALCONNECTION BY TYPE DE No. of TOTALTYPE OF USUARY Conex MEASUREMENT. Conex.With Measurer 32,150Without Measurer 14.206 46,357With Measurer 1,072Without Measurer 508 1,580With Measurer 134Without Measurer 64 198With Measurer 383Without Measurer 183 566With Measurer 80Without Measurer 655 735DomesticCommercialIndustrialistStateSocialTOTAL 49,436CONNECTION BY TYPE DE No. of TOTALTYPE OF USUARY Conex MEASUREMENT. Conex.With Measurer 127,620Without Measurer 40.154 167,774With Measurer 2,430Without Measurer 775 3,205With Measurer 441Without Measurer 128 568With Measurer 688Without Measurer 110 798With Measurer 488Without Measurer 1.225 1,713DomesticCommercialIndustrialistStateSocialTOTAL 174,058CONNECTION BY TYPE DE No. of TOTALTYPE OF USUARY Conex MEASUREMENT. Conex.With Measurer 6,767Without Measurer 4.077 10,843With Measurer 212Without Measurer 144 356With Measurer 39Without Measurer 20 59With Measurer 76Without Measurer 39 114With Measurer 19Without Measurer 232 251DomesticCommercialIndustrialistStateSocialTOTAL 11,623PROFILE: CONSTRUCTION OF THE PLANT OF RESIDUAL WATER TREATMENTTABOADA And SUBMARINE EMISSARY - DISTRICT And PROVINCE Of the CALLAO45Picture 2.22Connections by type of User – Area Commas - ChillónSource: Equipment Commercial Management, December 2005 - SEDAPALb) Component of the sewage system systemPrimary system of HarvestingThe scope of the project is conformed at the moment by the 5 areas of drainage of the ZoneNorth of Lima: 6 Comas-Chillo'n, Bocanegra, Centenary, Nº and Costanero, occupyingtotal area of approximately 44.000 Has. With the entrance of operation of the InterceptorNorth these 5 areas will be redistributed in 8, adding itself to the previous ones, Navy,Argentina and Nº 19. The benefitted area is limited by the superior part of the city and bythe inferior part with the sea, by the North by the river Chillón and the South by the avenues Strollof the Republic, Grau and Nicholas Ayllón until the District of Santa Anita.As well, the districts involved in the scope of the project are: Magdalena of the Sea,Free Town, San Miguel, Miraflores, San Isidro, Surrounded, The Agustino, Santa Anita, Ties,Jesus Maria, the Victory, Lynx, Scrub, Bellavista, Carmen of the Legua, Callao, the End,San Juan de Lurigancho, Rímac, San Martín de Porres, Independence, Commas,Carabayllo and the Olive trees; some in its totality and other partially.Next a description becomes of the included/understood areas of drainage in the areaof influence of the project, same that once finished works of the InterceptorNorth will come together towards the PTAR Taboada.1. - Area of Drainage Nº 01 (Costanero)It includes/understands the districts of Magdalena of the Sea, Free Town, San Miguel, Miraflores and SanIsidro. The main collector for this area, is the Costanero which runs parallel to the coastand he directly unloads the water-drainage of the area to the sea by means of a pipe of 1270 mm(50”) of diameter. He has an area of drainage of 1.929,50 Has.The Costanero Collector begins in the Domodossola park, with 14”Ø, crosses the leveeof Miraflores where by means of pumping he is united with the Schell Collector, of 21”Ø and gatherswater-drainages of the Limatambo Collector of 24”Ø. In the Av. Of the Army the water-drainages riseby means of a pumping camera. It intercepts to the Salaverry Collector of Ø 21” and the sectionswaters under the Collector Navy, of the Collectors N° 12 of Ø 28” and Sucre Collector ofØ 18”. Finally, 21” receives the water-drainages of the Collector N° 1 of Ø;. In a Camera ofMeeting jointly unloads the water-drainages to the sea the water-drainages of the collectorNavy.CONNECTION BY TYPE DE No. of TOTALTYPE OF USUARY Conex MEASUREMENT. Conex.With Measurer 111,044Without Measurer 74.018 185,063With Measurer 2,018Without Measurer 1.155 3,173With Measurer 329Without Measurer 194 523With Measurer 616Without Measurer 128 744With Measurer 254Without Measurer 2.087 2,341DomesticCommercialIndustrialistStateSocialTOTAL 191,842PROFILE: CONSTRUCTION OF THE PLANT OF RESIDUAL WATER TREATMENTTABOADA And SUBMARINE EMISSARY - DISTRICT And PROVINCE Of the CALLAO46Once “Obra intercepting North enters operation, the Costanero collectorit unloaded in a camera of the North Interceptor.Picture Nº 2.23Areas served by the districtArea of Drainage Nº 01AreaArea of Drainage included/understood Districts (It has)Population(hab.)Magdalena of Sea 361,00 50,312Town Frees 20,36 3,471San Miguel 467,35 56,551Miraflores 480,22 40,200San Isidro 600,57 31,0781COSTANEROSUBTOTAL 1.929,50 181,612MIRAFLORESSAN ISIDROMAGDALENAOF THE SEASAN MIGUELFREE TOWNPROFILE: CONSTRUCTION OF THE PLANT OF RESIDUAL WATER TREATMENTTABOADA And SUBMARINE EMISSARY - DISTRICT And PROVINCE Of the CALLAO472. - Area of Drainage Nº 02 (Navy)The area of drainage of the Collector Navy includes/understands some districts with system ofsewage system adjacent to the left margin of the Rímac river. It has a drainage areaof 2.505,69 It has.40” initiates its route in the Pershing Avenue with a diameter of Ø; interceptingwater-drainages of the Salaverry Collector of Ø 21” and catching water-drainages of the zones of Orrantia,soon continuous its route by the Av. Navy and intercepts to the Collector N° 12 of Ø 28”,18” receives the water-drainages of the University Collector of Ø;. Finally it is connected withCostanero collector soon to unload directly to the sea.Later with the beginning of North Intercepting Obra, the collectorNavy will join in the North Interceptor, to the height of block 36 of the Av. Navy.The involved districts Are surrounded, Jesus Maria, the Victory, Free Town, SanMiguel, Lynx, Scrub and San Isidro.Picture Nº 2.24Areas served by the districtArea of Drainage Nº 02AreaArea of Drainage included/understood Districts (It has)Population(hab.)Surrounded 540,87 74,074Jesus Maria 457,00 60,845Victory 174,80 39,509Town Frees 408,58 69,646San Miguel 424,84 51,407Lynx 303,00 54,131Scrub 99,19 25,229San Isidro 97,41 5,0412NAVYSUBTOTAL 2.505,69 379,882PROFILE: CONSTRUCTION OF THE PLANT OF RESIDUAL WATER TREATMENTTABOADA And SUBMARINE EMISSARY - DISTRICT And PROVINCE Of the CALLAO483. - Area of Drainage Nº 03 (Argentina)The area of drainage of the Collector 10 Nº or Argentina, includes part of the Scrub districts,Near, Free Town, San Miguel, Bellavista, Carmen of the Legua and Callao. It hasarea of 1.697,23 Has.It catches the water-drainages of the Center of Lima, beginning with a diameter of 12”Ø, soonit receives the water-drainages of the Collector N° 5 of 32”Ø of diameter and later it increases hisdiameter to 1100 mm, until the reception point of the water-drainages of the Palomino collectorof 24”Ø. Later, it receives the water-drainages of the San jOse collector. It will unload hiswaters in the North Interceptor in the crossing of the Av. Argentina and Pasaje the Sun.Picture Nº 2.25Areas served by the districtArea of Drainage Nº 03AreaArea of Drainage included/understood Districts (It has)Population(hab.)Scrub 222,81 56,673Surrounded 702,61 96,224Town Frees 9,06 1,544San Miguel 119,90 14,508Bellavista 190,67 31,596Carmen of Legua 73,45 14,551Callao 378,73 41,1243ARGENTINASUBTOTAL 1.697,23 256,221PROFILE: CONSTRUCTION OF THE PLANT OF RESIDUAL WATER TREATMENTTABOADA And SUBMARINE EMISSARY - DISTRICT And PROVINCE Of the CALLAO494. - Area of Drainage Nº 04 (Collector Nº 19)The drainage area includes/understands the adjacent districts with system of sewage system toleft margin of the Rímac river, involves to the districts mentioned in the picturefollowing and they are caught by the Collector 19 N° or also Moral call collectorDuárez.Receiving the water-drainages of Santa Anita, with a diameter of 14”Ø, it gathers collectorsminors, increase their diameter until 48”Ø after receiving the water-drainages of thesesmaller collectors and an overflow of 32”Ø of the Argentina collector. Finallyhe will connect to the North Interceptor in the Av. Moral Duarez.Picture Nº 2.26Areas served by the districtArea of Drainage Nº 04AreaArea of Drainage included/understood Districts (It has)Population(hab.)Surrounded 882,49 120,859Tie 63,64 5,621Agustino 310,31 42,512Santa Anita 213,80 33,394San Luis 5,73 789Carmen of Legua 138,55 27,447Callao 248,72 27,0074Nº 19SUBTOTAL 1.863,24 257,631PROFILE: CONSTRUCTION OF THE PLANT OF RESIDUAL WATER TREATMENTTABOADA And SUBMARINE EMISSARY - DISTRICT And PROVINCE Of the CALLAO505. - Area of Drainage Nº 05 (Centennial)The drainage area includes/understands the extension that has not been caught by the North Interceptorin the North part of Lima, that is it drains his water-drainages to the left margin of the interceptor.It includes/understands to the districts of the Callao, the End, San Miguel, the Per it, San Miguel,Punta and Bellavista. Its total area is 2.407,33 Has.They receive the unloadings of the following collectors: Maranga collectors and the Per it, thatthey unload in the Camera of Meeting located in the seat Túpac Amaru (Av. Argentinathe Av. Centenario or Néstor Gambeta); Collectors Arica, Ancash and the Callao Interceptorthat they unload previously to the located Unique Camera in the Garibaldi Seat and of thereby means of pumping to the Camera of Meeting of the Seat Túpac Amaru and Colector Argentina.From the meeting camera the continuous Centennial collector its route until arriving athe Acapulco Beach where unloading finally to the sea.Picture Nº 2.27Areas served by the districtArea of Drainage Nº 05AreaArea of Drainage included/understood Districts (It has)Population(hab.)Callao 1.732,09 188,079End 75,00 4,840San Miguel 59,91 7,249Per It 275,00 61,898Bellavista 265,33 43,9695CENTENARYSUBTOTAL 2.407,33 306,305PROFILE: CONSTRUCTION OF THE PLANT OF RESIDUAL WATER TREATMENTTABOADA And SUBMARINE EMISSARY - DISTRICT And PROVINCE Of the CALLAO516. - Area of Drainage Nº 06 (Collector Nº 6)It drains a great extension, arriving until the 8.618,46 Has, within the collectorsmain we have the Collector Great Song. In addition it includes/understands to the districts of SanJuan, of Lurigancho, the Agustín, Rímac, and San Martín de Porres.One begins in Great Song, with a diameter of 14”Ø before, increases his diameter 18”Øto receive the water-drainages of the collectors the Flowers of 18”Ø and Zárate of 24”Ø, continuousparallel to the Rímac River. Soon it receives the water-drainages of the Leoncio collectors Prado of24”Ø and N° 3 of 30”Ø. It is projected to unload his crude water-drainages to the Rímac River,but the agriculturists of the zone dam it and they use it crude for the irrigation of cultures ofto panllevar. In the future it will unload in a camera of the North Interceptor.Picture Nº 2.28Areas served by the districtArea of Drainage Nº 06AreaArea of Drainage included/understood Districts (It has)Population(hab.)Rímac 750,39 156,387San Martín de Porres 1.107,74 219,178San Juan de Lurigancho 6.169,00 843,961Lurigancho 11,9 151Callao 205,63 22,328Surrounded 72,03 9,865Agustino 301,77 41,3426SIXSUBTOTAL 8.618,46 1’293,212PROFILE: CONSTRUCTION OF THE PLANT OF RESIDUAL WATER TREATMENTTABOADA And SUBMARINE EMISSARY - DISTRICT And PROVINCE Of the CALLAO527. - Area of Drainage Nº 07 (Bocanegra)The river basin or area of drainage of the Bocanegra collector is smallest and includes part ofthe districts of the Callao and San Martín de Porres. The river basin has an area of 1.142,10 Has. volume is unloaded without no treatment to the sea through a pipe of 810 mm(32”) of diameter, located approximately to 2,8 km to the north of the opening ofRímac river. In the future it will unload in a camera of the North Interceptor.Picture Nº 2.29Areas served by the districtArea of Drainage Nº 07AreaArea of Drainage included/understood Districts (It has)Population(hab.)Callao 711,85 77,2967 San Martín de Porres 430,25 85,129BOCANEGRASUBTOTAL 1.142,10 162,426PROFILE: CONSTRUCTION OF THE PLANT OF RESIDUAL WATER TREATMENTTABOADA And SUBMARINE EMISSARY - DISTRICT And PROVINCE Of the CALLAO538. - Area of Drainage Nº 08 (Comas-Chillo'n)It gathers the water-drainages of the districts of Independence, Commas, Carabayllo, part of SanMartín de Porras and the Olive trees. Its beginning takes place in the Trapiche collector with Ø 44” andsoon it receives the water-drainages of the collectors Engineering (Ø 21”), Infants (Ø 24”), Palao (Ø21”), Garagay (Ø 18”) and Chillón (Ø 72”). At the moment it unloads his water-drainages in the beachOquendo. Once the North Interceptor between in operation, will unload inprojected plant of treatment Taboada.Picture Nº 2.30Areas served by the districtArea of Drainage Nº 08AreaArea of Drainage included/understood Districts (It has)Population(hab.)Carabayllo 9.471,00 196,036Commas 2.936,00 468,932Independence 808,00 183,096Olive trees 1.825,00 297,589San Martín de Porres 1.398,01 276,611Callao 448,98 48,753Rímac 125,61 26,1788COMMAS - CHILLÓNSUBTOTAL 17.012,60 1’497,194PROFILE: CONSTRUCTION OF THE PLANT OF RESIDUAL WATER TREATMENTTABOADA And SUBMARINE EMISSARY - DISTRICT And PROVINCE Of the CALLAO53Secondary system of HarvestingThe network of secondary collectors in the area of influence of the project is conformedmainly by pipes of 200, 250 and 300 mm, in a length overall of 5.162 km.In picture 2.21 are the length overalls of primary and secondary networksin the districts involved in the project.Domiciliary connectionsIn the influence area 584.556 connections of sewage system exist.Picture 2.31Length of primary and secondary networks of sewage system, 2004(in km)2.1.3 Works in Execution (Intercepting North)The North Interceptor has like purpose of eliminating the release points ofcrude water-drainages to the sea, water obstacles or agricultural uses with crude water-drainages, withinterception of eight primary collectors and to transport them until the Taboada beach,zone in which the future plant of previous treatment to the launching will be locatedsubmarine from the water-drainages to the sea.NonPrimary1 Bellavista 4.3 170,62 Scrub 5.6 77,03 Callao 55.3 478,14 Carabayllo 15.2 229,15 Carmen of Legua 7.1 34,96 Commas 36.9 462,37 Agustino 8.0 180,78 Independence 7.4 164,99 Jesus Maria 8.6 72,910 Per It 4.5 51,011 End 4.7 29,012 Victory 33.5 226,413 It files 67.9 428,014 Lynx 7.7 59,415 Olive trees 27.3 319,816 Magdalena of Sea 12.2 75,817 Miraflores 21.4 200,118 Town Frees 11.7 95,019 Rimac 16.2 144,920 S. Juan de Lurigancho 50.4 693,121 San Isidro 15.0 189,222 San Martín de Porras 43.0 496,223 San Miguel 11.5 142,524 Santa Anita 14.1 141,1489,5 5.162Source: Statistical yearbook 2004 - Management of Development and Investigation - SEDAPALTotal population of the ProjectSecondary Districts53PROFILE: CONSTRUCTION OF THE PLANT OF RESIDUAL WATER TREATMENTTABOADA And SUBMARINE EMISSARY - DISTRICT And PROVINCE Of the CALLAO54Four of these collectors will be intercepted in the high part, to the left of the riverRímac, and other four in the low part, to the right of the river. This division obeys atopographical conditionses and city-planning, because the high part, unlike the loss, hasan irregular topography. The low part is uniform and is conformed by areasagriculturists and the Airport the International Jorge Chávez, and finishes in the coastal zone.Six of these eight collectors are intercepted in the line of the interceptor. Bothrest arrive directly at the Taboada beach through derivations that alsothey comprise of works of the Interceptor.Operation of the SystemIn the Taboada beach they meet the interceptor, the derivation of Comas-Chillo'n and the lineof Sarita impulsion Colony, in the camera of grates that takes the name of the beach.Along with the line from unloading to the sea, this one is full stop of the interceptor.The interception begins in the Costanero collector (Ø 1500 mm.) with a camerainterceptor of two floodgates to turn aside the water-drainage to the sea in case ofemergency.The second interception point happens with the derivation of the collector Navy (Ø1100 mm), in the crossing of the avenues Navy and Insurgents.Soon the interceptor will catch the water-drainages of collector 10 (Ø 1200 mm) and the 19 (Ø 1350mm), in the avenues Argentina and Morales Duárez, respectively. This last pointone is underneath the dock of containment of the Rímac river. Like these two collectorsthey go to the Centennial collector –y this one, finally, to mar– the intercepting camerasthey have the possibility of avoiding the interception, in case of emergency.Like in the 2,8 kilometers constructed by the method of Pipe Jacking or “empuje oftubos” in the high part, that concludes here, the interceptor will cross a river Rímac underneathof its bed.From here, the low part of the interceptor begins. The original outline, withinAirport the International Jorge Chávez, was changed by one parallel. To the height ofairport is intercepted the 6 collectors and Bocanegra; this last one needs to berelocated and it will be made by the avenue Elmer Faucett to avoid the section that happens throughairport, closely together of the surface.The interception with collector 6 is particularly important, because here it is hadinstalled a floodgate to protect the airport. If this one is closed, the overflow ofemergency installed in the first mailbox after the river will begin to receivedammed water-drainages and will lead them towards the camera of unloading in the river.The Centennial collector, who at the moment unloading to the sea, will arrive at the camera of gratesin the pumping station Sarita Colony, and there, line of impulsion ofsame name, until the Taboada beach. The camera of grates in this beach, therefore,it will not take care of the water-drainages originating of this collector.The collector Chillón Commas arrives at the camera of grates of the Taboada beach througha derivation.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment